Phase one, 3,000 metre drill programme began on the Calicanto group of properties in December 2006 and was completed in April 2007.
Arian is continuing to advance two underground declines along the Calicanto and San Buenaventura structures. The Calicanto decline is currently 95 metres in and the San Buenaventura decline is 80 metres in. Run-Of-Mine (ROM) material is being stockpiled before being treated in a nearby milling facility which will indicate both head grade and recovery. Mapping and sampling is ongoing as the decline is advanced along strike.
Some of the better results from the initial phase of the Calicanto exploration campaign include >10,000 g/t Ag and 10.9 g/t Au over 1.2 m, 1,720 g/t Ag and 1.92 g/t Au over 1.7 m, 649 g/t Ag and 2.37 g/t Au over 1 m, 533 g/t Ag and 1.12 g/t Au over 2 m, 407 g/t Ag and 2.08 g/t Au over 2 m and 383 g/t Ag and 5.7 g/t Au over 1.1 m. These samples were taken from veins which are part of a wider (4.5 - 5 m) zone of stockwork mineralisation.
The table below shows the results from the drilling programme.
Drill-hole
From (m)
To (m)
Core Length (m)
True Thickness (m)
Au (g/t)
Ag (g/t)
AgEq*
(g/t)
CAL-06-001
117
119.2
2.2
1.60
0.9
409.1
452
inc.
118.5
119.2
0.8
0.60
2.5
1150
1270
143
143.2
0.2
0.14
4.46
3550
3764
CAL-06-002
82.05
96.0
13.95
9.90
0.21
120.98
131
inc
90.1
96.0
5.9
4.20
0.18
177.02
186
CAL-06-003
139.6
140
0.4
0.35
2.75
64.30
196.30
CAL-06-003
161.65
164.6
2.95
2.10
0.78
199.59
236.84
inc.
163.6
164.6
1
0.70
1.75
386.00
469.76
CAL-06-006
68.85
69.45
0.6
0.45
0.06
212.00
214.78
CAL-06-006
130.55
132.5
1.9
1.35
1.86
156.00
245.28
CAL-06-007
118.75
120.75
2
1.75
1.27
98.20
158.92
CAL-06-008
150.25
155.45
5.2
4.5
8.54
296.75
706.65
inc.
152.9
153.45
0.55
0.50
43.50
2,130.00
4,218.00
CAL-06-008
209.6
212.95
3.35
2.75
1.15
47.09
102.05
inc.
211.7
212.95
1.25
1.05
2.40
34.20
149.40
CAL-06-011
199.2
206.25
7.05
6.30
6.80
154.42
480
inc.
200.85
203.5
2.65
1.90
8.23
235.01
630
inc.
205.25
206.25
1.00
0.70
13.42
106.00
750
CAL-06-014
136.4
137.7
1.3
1.10
1.10
98.00
150.56
CAL-06-015
38.95
40
1.05
0.90
1.15
13.10
68.06
CAL-06-015
86.7
88.1
1.4
0.7
0.77
167.00
204.06
CAL-06-016
138
141.5
3.5
2.5
0.17
161.29
169.33
inc.
139.7
140.75
1.05
0.75
0.29
286.00
300.11
CAL-06-017
103.75
110.4
6.65
4.70
7.17
1,054.64
1398
inc.
105.45
106.4
0.95
0.70
28.30
4,450.00
5808
*Silver equivalent grade is calculated on the basis of US$12.50/oz Ag and US$600/oz Au. Silver equivalent calculations reflect gross metal content and have not been adjusted for metallurgical recoveries.
Additional information with respect to the Calicanto property is contained in a technical report prepared by A.C.A. Howe International Limited, dated March 20, 2006, and entitled "Technical Report on the Calicanto and San Celso Projects, Zacatecas, Mexico "