Operations

Operations

San Celso & Ojocaliente District

San Celso

The San Celso property covers numerous historical workings over a number of high grade silver epithermal veins. Three main veins are exposed on the property. Arian has rehabilitated two workings to over 100 metres depth in order to access the workings and undertake detailed mapping and sampling.

Sampling has returned bonanza grades from the vein systems, in places up to 4 metres in thickness. Historical workings have only explored the oxide portions of these veins above the water table. Geological mapping has identified additional structures on, or trending on to Arian's property.

Additional information with respect to the San Celso property is contained in a technical report prepared by A.C.A. Howe International Limited, dated March 20, 2006, and entitled "Technical Report on the Calicanto and San Celso Projects, Zacatecas, Mexico "

Please click here for technical report (PDF, 810 kb)



Access and cleaning of old shafts at San Celso

Donovan 2 concession- from Milagros vein system

San Celso shaft rehabilitation

Underground sampling at San Celso
 
Email 'Overview' to a friendShow printable version of 'Overview' in a New Window